Solutions · 01

The MDC Series
Beyond the Container

Custom Modular AI Data Centers — MDC-1000 · MDC-3000 · MDC-5000. Purpose-built 55-ft steel modules, bolted into Tier III halls of any size.

01 Modular Data Centers

Custom Modular AI Data Centers — MDC-1000 · MDC-3000 · MDC-5000. Purpose-built 55-ft steel modules, bolted into Tier III halls of any size. Built for NVIDIA GB300 NVL72 at 140 kW/rack, with PUE ≤ 1.15 and WUE ≈ 0.

1–5+ MW
Custom module count
PUE ≤ 1.15
WUE ≈ 0 L/kWh
Tier III
Concurrently maintainable
Relocatable
Bolted · demountable
MDC Series modular concept diagram
The MDC concept: same engineering language, custom envelope.

Two-Row Halls

Hot-aisle-contained 2×N racking with full front and rear service access — no ISO width limit.

CDU Spine

Interior liquid plant row serves both rack rows; shorter runs, lower pump energy, one leak zone.

Roof-Mount Cooling

Dry/adiabatic cells on the module roof — zero added footprint, N+1 site pool.

8-Rack Group Kit

The invariant engineering unit: identical UPS, busway, CDU and CRAH kit replicated per group.

Integrated Front-of-House

NOC, gowning vestibule and spares inside the same envelope — no separate admin module.

EM-Shielded Standard

Welded shield walls, roof and floor — 60 dB (10 kHz–10 GHz), IEEE 299 verified. EMP hardening optional.

Reference Configurations

Three Optimized Sizes, One Kit of Parts

SpecMDC-1000MDC-3000MDC-5000
GB300 NVL72 racks82440
Blackwell Ultra GPUs5761,7282,880
FP4 inference8.8 EF26.4 EF44.0 EF
IT / facility load1.12 / 1.29 MW3.36 / 3.86 MW5.60 / 6.44 MW
Rack arrangement1 row × 82 rows × 122 rows × 20
Modules (DH + MEP)1 + 13 + 25 + 3
UPS · CDU (per group ×N)2 · 26 · 610 · 10
Gensets 1.5 MW · cooler cells2 · 34 · 76 · 11
Layout Example

MDC-3000 — 2 × 12 Contained Hall

MDC-3000 plan view layout
Electrical

Tier III One-Line, Per Rack Group

MDC Series Tier III electrical one-line diagram
Cooling

Direct-to-Chip Loop, N+1 Every Stage

MDC Series direct-to-chip cooling loop diagram
Delivery Model

Factory-Tested, Field-Bolted, Fully Documented

01

Configure

Module count & hall geometry per site; 8-rack groups set capacity.

02

Factory Build

Modules and group kits built & tested L1–L3 with customer witness.

03

Set & Join

Crane set, bolted splices, weathertight — per ADC-INS-MDC instructions.

04

Commission

L4–L5 with full integrated systems test at design load.

05

Operate

Day 2 under SLA with 24/7 NOC — per ADC-OMM-MDC manual.

Documentation package: ADC-SPEC-MDC design specification · ADC-INS-MDC installation instructions · ADC-OMM-MDC operations & maintenance manual · ADC-Q-MDC quotation · ADC-PM-MDC pricing model — all included in this release.

Keep Exploring

The Other Two Lines of Business

02 · Containerized

Containerized Data Centers

Factory-built, liquid-cooled 1–5 MW modules — freestanding or retrofit — energized in months.

Explore Containerized →